Skip to main content

Building 1, 2nd Floor Renovation

Location:  National Energy Technology Lab, Albany, OR
Client:  Department of Energy
Completion Date:  September 2019
Contract Value:  $3,112,066
Architect:  AECOM

GbOSS provided construction services for the 2nd Floor of Building 1, located at the National Energy Technology Lab in Albany, OR.

The floor layout was converted from a double load corridor of office and support space to a racetrack style layout. Renovations provided new offices, meeting/conference rooms, a kitchenette, relocated ADA men’s and women’s toilet rooms, as well as other support spaces.

The project includes installation of:

  • Two new exterior egress doors
  • Partitions with sound insulation batt
  • HVAC to serve the renovated spaces
  • Rooftop air-handling unit with ductwork
  • Lighting and electrical to meet the new space configuration
  • Automatic wet fire sprinkler system
  • Electrical room and data closet
  • Plumbing work